Delivery of HDD Tools for SuedLink – Vebraeken Infra

Client: Verbraeken Infra
Location: Germany
Completed: August 2025

For the large-scale SuedLink project, we partnered with Vebraeken Infra to supply high-quality HDD tools designed to meet the highest standards of precision and durability.

Delivered Tools

  • 22” Hole Opener with a 2500 mm shaft length (shoulder/shoulder)
  • 40 subs and crossovers, including:
    • From 6 5/8″ FH to 5 1/2″ IF
    • From 6 5/8″ FH to 4 1/2″ IF
    • From 6 5/8″ FH to 6 5/8″ REG
    • Both saver subs and blind subs

Each sub and crossover was carefully manufactured and individually numbered, ensuring full traceability and consistent quality control.

Added Value

With this delivery, Vebraeken Infra gained access to robust and reliable drilling tools, specifically engineered for demanding HDD projects like SuedLink. Our solutions contribute to:

  • Increased efficiency on site
  • Reduced downtime through durable design and materials
  • Maximum reliability thanks to custom engineering and strict quality control

Interested in this project?